Mountain Bike Gateway

  • Facebook
  • Google+
  • LinkedIn
  • RSS
  • Twitter
  • YouTube
  • Blog
  • Gear
  • Reviews
  • Venues
  • News

How Seattle’s mayor gave planners the fire to make improvements fast

Email, RSS Follow
Pin It

2nd Avenue, Seattle.

Part of a series this week to accompany our new how-to guide for cities on creating programs that quickly change city streets. Ingredient #2 for such a program: “A system for seizing opportunity.”

In 2014, Seattle used the simplest possible system for seizing an opportunity on its streets: an unexpected mayoral mandate.

Though the city had experimented with protected bike lanes a few years earlier, the design was expensive and the implementation slow. Recently elected Mayor Ed Murray felt the city was falling behind in delivering a working bike network and had been slow to address traffic safety problems such as crashes involving people biking on Second Avenue.

So at a breakfast speech on Bike to Work Day in May 2014, Murray announced that Second Avenue would get a protected bike lane in time for the fall launch of Pronto bike sharing.

The declaration accelerated a previously planned project by 18 months. Outreach for the design of a bidirectional protected bike lane on the one-way downtown street began immediately. Additional features, including dedicated bike signal phases at intersections, were added to the plan that summer.

It was a heart-thumping race to the finish for Seattle staffers. In one story that city staff like to tell, the install team ran out of side-mount flanges just before installation weekend. Two signal electricians ended up making an emergency road trip to the nearby city of Everett to look for spare parts that they painted and cut to fit.

The completed Second Avenue opened in September, just four months after the mayor’s proclamation. From outreach to installation, the work was carried out exclusively in-house at Seattle DOT. “Biking downtown will never be the same again,” declared Seattle Bike Blog. 

A week later, the city released bike counts documenting a tripling of bike volumes along the avenue. That success led quickly to additional projects—and a new five-year timetable for building Seattle’s entire city center bike network.

Some things can be easier said than done. Which is, actually, the whole point of saying them.

Download our 24-page report on quick-build projects here, or email aisling@peopleforbikes.org to request a hard copy.

The Green Lane Project helps U.S. cities build better bike lanes to create low-stress streets. You can follow us on LinkedIn, Twitter or Facebook or sign up for our weekly news digest about protected bike lanes. Story tip? Write michael@peopleforbikes.org.

We’re part of PeopleForBikes. Follow the broader story of bicycling on Facebook and Twitter too.

  

 

Email, RSS Follow
Pin It

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Subscribe via Email

Recent Articles

Flashback Friday: MBA, January ’91, Canondale’s First Suspension Bike

January 15, 2021 By Upright

What’s on the horizon for Twin Peaks?

January 15, 2021 By Upright

Working Class Hero – Brian ScarBrough Trains With Maxima Oils

January 15, 2021 By Upright

Making The Ultimate Sprinter Van

January 15, 2021 By Upright

Related Articles

  • Suspension Fork Shootout: Fox 38 Vs. RockShox ZEB Forks

    Jan 26, 2021
  • Mountain Bike Action Bike Test: Rocky Mountain’s Altitude Enduro Machine

    Jan 25, 2021
  • Mountain Bike Action Product Test: G-Form E-Line Knee Pads

    Jan 24, 2021
  • Fontana’s Parks and Recreation Department Forces Police to Shut Down Mountain Bike Event

    Jan 23, 2021
  • Gabriel Wibmer Joins Canyon

    Jan 23, 2021
  • Flashback Friday

    Jan 22, 2021
  • Mountain Bike Action First Ride: Cannondale Scalpel SE 1 XC Race Bike

    Jan 22, 2021
  • Throwback Thursday: MBA January 2001

    Jan 21, 2021
  • Comeback Of Mount 7 Psychosis

    Jan 21, 2021
  • NEW 2021 DEVINCI MARSHALL

    Jan 20, 2021

Copyright © 2021 MountainBikeGateway.com

About · Privacy Policy · Terms of Use · Sitemap · Contact

This website uses cookies to ensure you get the best experience on our website. Learn more.